Return to site

ARTC Level Crossings

The Taylor Rail Crew completed multiple level crossings between Parkes, Quandialla and The Rock. The works included: 

  • Full depth reconditioning of level crossings up to 20m in length for dual track crossings
  • Civil drainage works completed
  • Track welding and adjusting
  • Track resurfacing
  • Guard rail installation
  • Asphalt level crossing installation with line markings
  • Pedestrian crossing installation with tactile indicators